Data-center cases the atlas plans to cover
Twenty-four cases across eight US regions, ranked for future releases. Eight anchor versions four and five and carry full essays, maps, and bibliographies on the site today. The rest queue toward later releases. Each entry lists the operator, the dominant displacement mechanism, the active organizing groups, and the historical atlas case offering the sharpest precedent.
The research briefs behind this list are committed to the repository at docs/data-center-research. Every factual claim the atlas makes about a facility cites a URL, docket number, or filing in those briefs.
Mid-Atlantic
3 cases
Northern Virginia, suburban Maryland, Delaware. Dominion Energy rate pass-through and the densest hyperscale footprint on the planet.
Prince William, VA
Version four, shipped
Prince William Digital Gateway, Pageland Lane
- Operator
- QTS + Compass
- Mechanism
- Direct land assembly, Manassas Battlefield viewshed, transmission build-out, rezoning voided by VA Court of Appeals 2025
- Organizers
- Coalition to Protect Prince William County (Elena Schlossberg, 2014), American Battlefield Trust, Piedmont Environmental Council, Oak Valley HOA
- Atlas precedent
- Chavez Ravine
Culpeper and nine Piedmont counties, VA
Version five, queued
Culpeper Tech Zone plus Valley Link 765 kV corridor
- Operator
- CloudHQ, Databank, EdgeCore, Red Ace, Amazon
- Mechanism
- 950-acre zone, Oak Green substation relocation, 115-mile transmission eminent domain
- Organizers
- Coalition to Save Culpeper, Piedmont Environmental Council
- Atlas precedent
- West Side San Antonio
Loudoun, VA
Version five, queued
Loudoun Dulles corridor saturation
- Operator
- 200 operators, aggregate
- Mechanism
- 899 million gallons water in 2023, $4M per acre offers to residential holdouts
- Organizers
- Piedmont Environmental Council, Loudoun Now
- Atlas precedent
- Fillmore and Western Addition
Southeast
2 cases
TVA and Southern Company territory. Hyperscale campuses settle next to Black neighborhoods utilities and refineries already sacrificed.
Shelby, TN
Version four, shipped
xAI Colossus and Colossus 2, Boxtown and Whitehaven
- Operator
- xAI
- Mechanism
- Unpermitted gas turbines, Memphis Sand Aquifer drawdown, MLGW rate pass-through
- Organizers
- Memphis Community Against Pollution (KeShaun Pearson, 2020), Young Gifted and Green (LaTricea Adams, 2016), Southern Environmental Law Center, NAACP Memphis
- Atlas precedent
- Overtown I-95
Newton, GA
Version five, queued
Meta Stanton Springs
- Operator
- Meta
- Mechanism
- 500,000 gal/day aquifer draw plus disputed 338-acre expansion
- Organizers
- Newton County Board of Commissioners, Christi Studdard, Covington News
- Atlas precedent
- Cabrillo Village
Texas
3 cases
ERCOT runs outside the federal interconnection queue. SB 6 lets 75 MW loads plug in with minimal public review.
Taylor, TX
Version five, shipped
Stargate Abilene
- Operator
- Crusoe, Oracle, OpenAI
- Mechanism
- 1,100 acres plus 360 MW on-site gas plant, 85 percent 10-year abatement, Hubbard Creek reservoir draw
- Organizers
- Sierra Club Lone Star, Public Citizen Texas, Taylor County Action Network
- Atlas precedent
- Cabrillo Village
Bexar, TX
Version five, queued
San Antonio Westover Hills cluster
- Operator
- Microsoft, Vantage
- Mechanism
- 33 acres, 2,642 trees cleared under 8-3 Council variance
- Organizers
- Westside Preservation Alliance, Esperanza Peace and Justice Center, COPS
- Atlas precedent
- West Side San Antonio and HemisFair '68 (already in atlas)
Pecos, Reeves, Ector, TX
Version six, surveyed
Crusoe and Pacifico Permian flare-gas siting
- Operator
- Crusoe, Pacifico
- Mechanism
- Railroad Commission flaring permits, no zoning review
- Organizers
- Commission Shift (Virginia Palacios, 2021), Earthworks Permian
- Atlas precedent
- Chavez Ravine
Great Plains
3 cases
Meta and Google clusters on Papio Creek, Jordan-Dakota, and Grand River. LB 1261 would carve a private gas plant out of the Nebraska public-power model.
Sarpy, NE
Version four, shipped
Meta and Google cluster, Papillion
- Operator
- Meta, Google, Tenaska, Tallgrass
- Mechanism
- LB 1261 privatized gas carve-out, OPPD rate pass-through, Platte aquifer
- Organizers
- Bold Nebraska (Jane Kleeb, 2010), Heartland Workers Center (2009), Senator Danielle Conrad, Flatwater Free Press
- Atlas precedent
- Chavez Ravine and Cooper Square
Mayes, OK
Version five, queued
Pryor MidAmerica Industrial Park
- Operator
- Mechanism
- Campus on Cherokee Reservation land confirmed by McGirt (2020)
- Organizers
- Cherokee Nation Environmental Protection Commission, Hoskin task force February 2026
- Atlas precedent
- San Juan Hill and East Harlem
Dallas and Polk, IA
Version six, surveyed
Waukee and West Des Moines cluster
- Operator
- Apple, Microsoft, Meta
- Mechanism
- 2,042 acres of farmland plus 5 million gal/day Jordan-Dakota water contract
- Organizers
- Iowa Citizens for Community Improvement, Iowa Environmental Council, Iowa OCA
- Atlas precedent
- Cabrillo Village
Midwest
3 cases
Licking, St. Joseph, and Racine counties sit on cheap farmland, a large regional aquifer, and a utility that has socialized grid-upgrade cost onto small ratepayers until state commissions ordered otherwise.
Licking (Johnstown and New Albany), OH
Version four, shipped
Meta, Intel, AWS, Google, QTS cluster
- Operator
- Meta, Intel, AWS, Google, QTS
- Mechanism
- 30-year 100 percent abatement, Hoover Reservoir and Alum Creek draw, covert aquifer drilling near Granville Superfund plume
- Organizers
- Ohio Citizen Action (1975), Ohio Consumers' Counsel, Reporting Project at Denison, St. Albans Township trustees
- Atlas precedent
- Malone Lincoln
St. Joseph (New Carlisle), IN
Version five, queued
AWS Project Amber
- Operator
- AWS
- Mechanism
- 35 million gal/day Kankakee aquifer dewatering, wetlands loss in a state that has lost 85 percent of its wetlands
- Organizers
- Citizens Action Coalition of Indiana, Hoosier Environmental Council
- Atlas precedent
- Cabrillo Village
Racine (ex-Foxconn site), WI
Version six, surveyed
Microsoft Mount Pleasant
- Operator
- Microsoft
- Mechanism
- 2,800-acre 2018 blight declaration for private economic development, 30-year TIF
- Organizers
- A Better Mount Pleasant (Kelly Gallaher), Wisconsin Watch
- Atlas precedent
- Chavez Ravine
Southwest
3 cases
Water is the binding constraint. ADWR froze new residential subdivisions across the Phoenix AMA in June 2023 while hyperscale campuses kept getting approved.
Maricopa, AZ
Version five, shipped
Tract Buckeye, Microsoft Goodyear, Compass Goodyear
- Operator
- Tract, Microsoft, Compass
- Mechanism
- Hassayampa groundwater draw, 40,000 homes frozen, APS rate pass-through
- Organizers
- Poder in Action (2015), Chispa Arizona, Western Resource Advocates, RUCO
- Atlas precedent
- San Pedro and West Side San Antonio
Valencia, NM
Version five, queued
Meta Los Lunas
- Operator
- Meta
- Mechanism
- 4.5 million gal/day municipal draw crossing Pueblo of Isleta senior rights and MRGCD irrigators
- Organizers
- Pueblo of Isleta Natural Resources Department, Middle Rio Grande Conservancy District, Western Resource Advocates
- Atlas precedent
- Cabrillo Village
Storey, NV
Version six, surveyed
TRIC plus Truckee River effluent pipeline
- Operator
- Switch, Google, Tract
- Mechanism
- Truckee return-flow diversion, Pyramid Lake senior rights
- Organizers
- Pyramid Lake Paiute Tribe Water Rights Office, Great Basin Resource Watch, Progressive Leadership Alliance of Nevada
- Atlas precedent
- Chavez Ravine and Rondo
Mountain West
3 cases
Mormon agricultural land on the Wasatch Front, Simplot farmland on the Snake River Plain, High Plains ranchland around Cheyenne.
Utah (Eagle Mountain), UT
Version five, shipped
Meta, Google, QTS, Tract cluster in Cedar Valley
- Operator
- Meta, Google, QTS, Tract
- Mechanism
- Cedar Valley groundwater drawdown, reduced Great Salt Lake inflow, Rocky Mountain Power easements
- Organizers
- Utah Rivers Council (1994), Bridgerland Audubon, Alliance for a Better Utah, Utah Office of Consumer Services
- Atlas precedent
- Cabrillo Village
Ada (Kuna), ID
Version five, queued
Meta and Diode Gemstone Technology Park
- Operator
- Meta, Diode Ventures
- Mechanism
- 1,100 acres of Yamamoto and Simplot-adjacent farmland, seven ag water rights, farmworker commute shed pressure
- Organizers
- Idaho Conservation League, Idaho Rural Council, Reps. Mickelsen and Gannon
- Atlas precedent
- West Side San Antonio and Cabrillo Village
Laramie (Cheyenne), WY
Version six, surveyed
Crusoe and Tallgrass Project Jade, Meta, Microsoft, Related Digital
- Operator
- Crusoe, Tallgrass, Meta, Microsoft, Related Digital
- Mechanism
- 1,375-acre industrial park plus up to 10 GW of approved load, Ogallala drawdown
- Organizers
- Wyoming Outdoor Council, Powder River Basin Resource Council, Wyoming Office of Consumer Advocate
- Atlas precedent
- Chavez Ravine and Malone Lincoln
Pacific Northwest
3 cases
The oldest hyperscale cluster in the United States. Google sited its first server farm in The Dalles in 2006.
Crook, OR
Version five, shipped
Meta and Apple Prineville
- Operator
- Meta, Apple, Bitmain
- Mechanism
- Municipal water-sale below cost, Crooked River baseflow loss, 16M-dollar Crook County school tax base loss in 2024
- Organizers
- WaterWatch of Oregon (1985), Oregon Citizens' Utility Board, Confederated Tribes of Warm Springs Natural Resources
- Atlas precedent
- Chavez Ravine and San Pedro
Morrow, OR
Version five, shipped
Amazon Boardman
- Operator
- AWS
- Mechanism
- Aquifer nitrate contamination, 45,000 rural residents on private wells, 20.5-million-dollar class-action settlement March 2026
- Organizers
- Oregon Rural Action (2002), Columbia Riverkeeper, Confederated Tribes of the Umatilla Indian Reservation
- Atlas precedent
- Cabrillo Village and the citrus-belt strikes
Wasco, OR
Version six, surveyed
Google The Dalles
- Operator
- Mechanism
- 1.19 million gal/day in 2024, one-third of city supply
- Organizers
- The Oregonian (Mike Rogoway), WaterWatch of Oregon, Reporters Committee for Freedom of the Press
- Atlas precedent
- San Pedro and Terminal Island
Submit a case
If you live in a region where hyperscale data-center construction pressure is active and not yet named above, open an issue or a pull request. The editorial rules in docs/editorial-rules.md are strict and non-negotiable, and the content schemas in velite.config.ts list every frontmatter field a new case must carry. The data-center section shows the shape a finished case takes.